Loading...
Most CBG plants lose 15-20% yield to poor feedstock tracking, delayed lab results, and reactive maintenance. BiogasOps digitizes your entire operation — from gate weighbridge to gas dispatch — so nothing falls through the cracks.
Temperature drift, inconsistent feedstock C/N ratios, delayed lab reports, unplanned downtime — these issues cost CBG plants ₹50L+ annually. We fix them.
Problem: Most plants lose 10-15% feedstock value to moisture fraud and poor C/N tracking
Complete mass-balance from weighbridge entry through stockyard inventory to digester feeding. Every kilogram accounted for with automatic quality checks.
Problem: Lab results take 24-48hrs, by which time the digester has already drifted
Full LIMS with sample tracking, test workqueue, real-time result entry, and automatic COA generation. Results visible in 4 hours, not 2 days.
Problem: A single compressor failure = ₹3L/day in lost CBG sales
Asset registry with QR codes, preventive maintenance schedules, and spare parts tracking. Predict failures before they happen.
End-to-end ERP architecture designed specifically for biogas operations
Gate entry, stockyard & feeding
Flow tracking & quality monitoring
Temperature, pH & FOSTAC monitoring
Sample tracking & COA generation
Cascade fills & order tracking
Assets, work orders & spares
Items, warehouses & transactions
Muster, tasks & payroll
Dashboards & predictions
Coming SoonMulti-tenant architecture with role-based access control. Manage multiple plants from a single dashboard with complete data isolation.
Complete data isolation between companies and plants
Owner, Admin, Manager, Supervisor, Operator roles
English, Hindi, Telugu, Punjabi, Odia supported